Customer service£º400-007-7724
  • Voice Coil Motors
  • Ironless Core Linear Motors
  • Iron Core Linear Motors
  • Linear Motor Stages
  • Linear Motor Drivers
Product list
Contact us

Telephone: 400-007-7724

Fax: +86 512-82175788

Postcode: 215300

E-mail: info@tmmotion.com

Address: Building 2£¬No.1299 Fuchunjiang Road,Development Zone Kunshan City Jiangsu Province, China.

Current position£ºHome > News Beijing Metro Line 28 or use a linear motor vehicle

Beijing Metro Line 28 or use a linear motor vehicle

time£º2019/9/11  click£º5575
     Beijing Metro Line 28 or use a linear motor vehicle. On August 19th, the Beijing Investment Website publicized the results of the second EIA of the Beijing Metro Line 28. According to the EIA report, the Beijing Metro Line 28 was upgraded on the basis of the original. The recent line was from Dongdaqiao Station to Guangqu East Road Station. The long-term planning will be extended. To Dongzhimen. Among them, the recent line is expected to start at the end of 2019 and be completed and opened to traffic by the end of 2022.
    According to the knowledge of the linear motor, the total length of the Beijing Metro Line 28 has increased from 8.77 kilometers to 8.877 kilometers. There are 9 stations, including 5 transfer stations. Specifically, it includes Dongdaqiao Station, Jingguangqiao Station, Guanghua Road Station, Core District Station, Dawang Road Station, Beijing East Railway Station, Daxie Pavilion Station, Guangqu Road Station, and Guangqu East Road Station.
     Because the overall length of the Beijing Metro No. 28 is not very long, it belongs to the medium traffic system. Therefore, some professionals recommend the use of six groups of linear motor vehicles. The length of the vehicle is about 101 meters and the peak operating speed is 80 km/h. It is mainly related to the fact that the Beijing Airport Line has tried to use a linear motor vehicle, and the feedback has been good for many years.
     According to the passenger flow forecast, the daily passenger flow in the initial period(2025) will reach 124,500 passengers and the passenger flow intensity will be 14,000 persons/km; In the near future(2032), there were 165,900 passengers per day and 19,000 passengers per kilometer. In the long term(2047), there were 270,200 passengers and the passenger flow intensity was 23,000 person-kilometers. In terms of operations, Line 28 will begin operation at 5 o'clock in the morning and end at 11 o'clock in the evening. It will operate for a total of 18 hours throughout the day. The initial, near and long-term peak hours are 18 pairs of / H, 20 pairs of / H, and 28 pairs of / H, which is the initial departure interval of about three-and-a-half minutes, the near term of three points, and the long-term two-minute 15 seconds.
     Compared with traditional vehicles, the linear motor subway has the same capacity, reducing the height of the car body, reducing the area of the tunnel, reducing costs, saving the land area, strong climbing ability, small turning radius, convenient line selection, convenient transfer, and less maintenance., Reduced operating costs, low noise, energy conservation, can be combined with traditional tracks, trains add and subtract fast.
     Kunshan Tongmao Electronics Co. Ltd. is a professional R&D and manufacturer that provides linear and swing motion solutions. Its main products are linear motors and linear Motors. Tongmao straight line motor with excellent quality and perfect after sale, has been recognized by many customers.
     This article originated from the original company of Kunshan Tongmao Electronics Co., Ltd.(www.tmmotion.com). Please indicate the source.